DOE Status Meeting of the
Linac Coherent Light Source Project
Agenda
November 17, 2005
Stanford Linear Accelerator Center
HOME
SUMMARY OF 11/2005 REVIEW |
Meeting Location: Red Slate Conference Room, Bldg 280C, Room 112 (map)
Start Length Topic Presenter
8:00 am 0:15 DOE Session DOE
8:15 am 0:15 Director’s Welcome J. Dorfan (or designee)
8:30 am 1:00 LCLS Construction Project Summary Assessment J. Galayda
- Technical Status/Accomplishments
- Response to Recommendations from Last Review
- Status of Readiness for CD-3b
- Issues/Summary Assessment
9:30 am 0:30 LCLS Cost and Schedule Status M. Reichanadter
- Schedule Performance and Milestone Status
- Cost Performance and Status
- Contingency Assessment
10:00 am 0:15 Break
10: 15 am 0:45 Conventional Facilities (CF) D. Saenz
- Current LCLS CF Projects (Sector 20, MMF, BSY, S24)
- Status of A/E
- Status of CM/GC
- Plans for construction (schedule, site impacts)
11:00 am 1:00 CF Design/Construction, Discussion with A/E and CM/GC SLAC, DOE
M. Siddiqi (Jacobs rep)
T. Malloy (Turner rep)
12:00 pm 1:00 Lunch LCLS, SLAC, DOE, Jacobs, Turner
1:00 pm 1:00 Tour of Construction Sites D. Saenz
2:00 pm 0:20 LCLS ISMS Program R. Hislop
2:20 pm 0:20 LCLS E-Beam Systems Status and (Inj-Lin) LLP D. Schultz
2:40 pm 0:20 LCLS (Und) LLP M. White
3:00 pm 0:20 LCLS Photon Systems Status J. Arthur
3:20 pm 0:20 LCLS Integration/Installation R.M. Boyce
3:40 pm 0:20 Break
4:00 pm 2:00 Discussion on Project Status, Contingency LCLS, SLAC, DOE
Readiness for CD-3b (Closed Session)
6:00 pm Adjourn