
| A two-day review of the LCLS Injector has been held at the Stanford Linear Accelerator Center to cover the LCLS injector performance requirements and to critically assess the proposed design and its ability to meet the injector's performance parameters. See the info document for more details. |
| The report of the review committee is now available online. |
| Workshop Chairperson: | David H. Dowell, SLAC | +1-650-926-2494 |
| Administration: | Helen O'Donnell, SLAC | +1-650-926-3368 |
| Prof. Patrick O'Shea, Chair, University of Maryland | +1-301-405-4977 |
| Dr. Erick R. Colby, Stanford Linear Accelerator Center | +1-650-926-3709 |
| Dr. Dinh Nguyen, Los Alamos National Laboratory | +1-505-667-9385 |
| Prof. Todd I. Smith, Stanford University | +1-650-723-1906 |
| Monday, November 3, 2003 | ||
| Overview | ||
| 08:30-08:45 | John Galayda, SLAC | Greetings |
| 08:45-09:00 | Mark Reichanadter, SLAC | Charge to the Committee |
| 09:00-9:30 | Committee Executive Session | |
| 09:10-10:00 | Dave Dowell, SLAC | Overview of the LCLS Injector |
| 10:10-10:30 | break & discussion | |
| Simulation and Gun Design | ||
| 10:30-11:15 | Cecile Limborg, SLAC | Injector Simulations |
| 11:15-11:45 | John Schmerge, SLAC | 120 Hz Gun and Load Lock |
| 11:45-13:00 | break for lunch | |
| Major Injector Components | ||
| 13:00-13:30 | Ron Akre, SLAC | RF Systems |
| 13:30-14:15 | Cecile Limborg, SLAC | Specifications for Electron Diagnostics |
| 14:15-14:45 | John Schmerge, SLAC | Prototyping at GTF |
| 14:45-15:00 | break | |
| Beam Quality Issues | ||
| 15:00-15:30 | Zhirong Huang, SLAC | Laser Heater Justification |
| 15:30-16:00 | Jim Welch, SLAC | Implementation of the Laser Heater |
| 16:00-17:00 | Dave Dowell, SLAC | Expt. Status of Beam Requirements for LCLS |
| 17:00-18:00 | Open discussion and Committee meeting | |
| Tuesday, November 4, 2003 | ||
| Discussion and Closeout | ||
| 08:00-10:00 | Committee Executive Session | |
| 10:00-11:00 | Closeout Session | |
| Provisions for presenting talks from a CD or a PC laptop are available as wells as using the old overhead projector. |
Name Last modified Size Description
Parent Directory -
Injector_Review-Committee_Info.pdf 15-Jun-2004 11:14 390K
LCLS_Injector_Review_Report_Nov_2003.pdf 15-Jun-2004 11:14 93K
Talk_Akre_RFsystem.pdf 15-Jun-2004 11:14 748K
Talk_Dowell_ExptStatus.pdf 15-Jun-2004 11:14 1.7M
Talk_Dowell_InjectorOverview.pdf 15-Jun-2004 11:14 12M
Talk_Huang_LaserHeaterJustification.pdf 15-Jun-2004 11:14 517K
Talk_Schmerge_120HzGun.pdf 15-Jun-2004 11:14 1.0M
Talk_Schmerge_GTFPrototyping.pdf 15-Jun-2004 11:14 1.1M
Talk_Welch_ImplementingLaserHeater.pdf 15-Jun-2004 11:14 1.9M
| Last Updated: | 24 Nov 2003 |
| Content Owner: | Dave Dowell, SLAC |
| Page Editor: | Heinz-Dieter Nuhn, SLAC |