| Energy: 3.000 GeV | Beam Status: AccPhy | Beam Current: 0.00 mA |
| Vacuum Quality*: 0.00 Ah | Loss Rate: 0.00 mA/min | Lifetime: 0.00 h |
| 3-JAN-2012 09:00 | SPEAR3 is scheduled to deliver beam to SSRL users in automatic mode with frequent fills every 5 min to 350mA . The SSRL program is defined in the 2011-2012 User Run Schedule. Maintenance and Accelerator Physics activities are scheduled every two weeks, Monday 6am through Wednesday 6am. |
| SSRL BEAMLINES | For Updates From the BL Duty Operator, Call 926-BEAM (2326) |
| Beamline | Steering | Period | Gap/mm | Field/T | K | Pwr/W | Yield/Ah | ||
|---|---|---|---|---|---|---|---|---|---|
| 1 | Closed | Fault | - | 48.0 | 1.249 | - | 0 | 1151.28 | |
| 2 | Closed | Fault | - | 48.0 | 1.249 | - | 0 | 1152.23 | |
| 4 | Closed | – | 10 | 18.0 | 1.892 | 40.64 | 0 | 1155.39 | |
| 5 | Closed | – | 10 | 45.3 | 0.331 | 5.65 | 0 | 763.46 | |
| 6 | Closed | Fault | 27 | 17.3 | 0.783 | 5.12 | 0 | 1147.90 | |
| 7 | Closed | – | 10 | 17.4 | 1.932 | 41.51 | 0 | 1155.46 | |
| 8 | Closed | Fault | - | 48.0 | 1.249 | - | 0 | 1150.20 | |
| 9 | Closed | – | 8 | 24.6 | 1.930 | 49.64 | 0 | 741.21 | |
| 10 | Closed | Fault | 15 | 23.7 | 1.278 | 16.36 | 0 | 1138.99 | |
| 11 | Closed | – | 13 | 16.0 | 1.996 | 32.63 | 0 | 1140.34 | |
| 12-2 | Closed | – | 67 | 22.0 | 0.142 | 0.29 | 0 | 1150.10 | |
| 13 | Closed | – | EPU | 30.9 | 0.223 | 1.66 | 0 | 1142.37 | |
| 14 | Closed | Fault | - | 48.0 | 1.249 | - | 0 | 1086.03 | |
| Top-off mode: Disabled | Total run electron beam current integral: 1258.344 Ah |
| Accelerator Information | |
| Vacuum Information (internal use only): SPEAR, Beamlines | |
| SPEAR Home Page | SPEAR Dedication video, Picture 1, Picture 2 |
| * Vacuum Quality = 0.4 * ( Lifetime / 1 h ) * ( Beam Current / 1000 mA )0.6 |