| Energy: 3.000 GeV | Beam Status: Beams | Beam Current: 94.27 mA |
| Vacuum Quality*: 5.33 Ah | Loss Rate: 0.03 mA/min | Lifetime: 54.97 h |
| 8-MAY-2008 19:42 | The scheduled program is to deliver beam to Users. |
| SSRL BEAMLINES | For Updates From the BL Duty Operator, Call 926-BEAM (2326) |
| Beamline | Steering | Period | Gap/mm | Field/T | K | Pwr/W | Yield/Ah | |
|---|---|---|---|---|---|---|---|---|
| 1 | Open | OK | - | 48.0 | 1.249 | - | 13 | 323.31 |
| 2 | Open | OK | - | 48.0 | 1.249 | - | 13 | 322.82 |
| 4 | Closed | – | 10 | 18.0 | 1.892 | 40.64 | 4424 | 0.00 |
| 5 | Open | – | 10 | 48.7 | 0.301 | 5.14 | 89 | 322.99 |
| 6 | Open | OK | 27 | 16.0 | 0.850 | 5.56 | 734 | 316.29 |
| 7 | Open | OK | 10 | 17.4 | 1.932 | 41.51 | 4614 | 323.79 |
| 8 | Open | OK | - | 48.0 | 1.249 | - | 13 | 323.07 |
| 9 | Open | OK | 8 | 24.6 | 1.929 | 49.63 | 4647 | 323.23 |
| 10 | Open | OK | 15 | 23.8 | 1.272 | 16.29 | 1788 | 323.39 |
| 11 | Open | OK | 13 | 16.0 | 1.996 | 32.63 | 4871 | 323.41 |
| 12-2 | Open | – | 67 | 7.4 | 0.783 | 1.61 | 486 | 316.17 |
| 13 | Open | – | EPU | 41.7 | 0.116 | 0.86 | 13 | 163.47 |
| Total Run Electron Beam Intensity Integral: 365.928 Ah |
|---|
| Vacuum Information
(Internal Use Only)
Dedication video Inside tunnel pictures 1 , 2 SPEAR3 Installation History SPEAR Home Page |